STACK Infrastructure NVA02 is an AI data center, located in the United States (9590 Hornbaker Rd, Manassas, VA 20109).
The site holds roughly 61,142 H100-equivalents of AI compute. It draws about 85 MW of power. Building and equipping it represents an estimated $3.2B of capital in 2025 dollars. It currently runs H100.
These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.