Microsoft Fairwater Atlanta

Compute capacity
768.8K H100e
IT power
636 MW
Capital cost
$24B

Microsoft Fairwater Atlanta is an AI data center operated by Microsoft, located in the United States (1435 Hwy 54 W, Fayetteville, GA 30214). Its compute is used by OpenAI, Microsoft.

The site holds roughly 768,769 H100-equivalents of AI compute. It draws about 636 MW of power — the scale of a small city. Building and equipping it represents an estimated $24B of capital in 2025 dollars. It currently runs B200.

Power is supplied through Georgia Power. These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.

Timeline
0384.4K768.8K2023-04-09: 02025-10-14: 388K2026-02-13: 388K2026-05-15: 388K2026-06-14: 768.8K2023-04-092026-06-14
Compute (H100e): 0 (2023-04-09) → 768.8K (2026-06-14)
Full record
Owner
Microsoft
Ownership confidence
Confident
Users
OpenAI (likely), Microsoft (likely)
Project
Microsoft AI WAN #confident
Country
United States
Location
1435 Hwy 54 W, Fayetteville, GA 30214
H100 equivalents
768,769
Power
636 MW
Total capital cost
$24B
Current chips
B200
All chips
B200
Energy suppliers
Georgia Power