Compute capacity
99.5K H100e
IT power
87 MW
Capital cost
$3.3B

Meta Gallatin is an AI data center operated by Meta, located in the United States (1 Meta Lp, Gallatin, TN 37066). Its compute is used by Meta.

The site holds roughly 99,545 H100-equivalents of AI compute. It draws about 87 MW of power. Building and equipping it represents an estimated $3.3B of capital in 2025 dollars. It currently runs B300.

These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.

Timeline
049.8K99.5K2023-09-11: 02026-02-09: 02026-06-15: 99.5K2023-09-112026-06-15
Compute (H100e): 0 (2023-09-11) → 99.5K (2026-06-15)
Full record
Owner
Meta
Ownership confidence
Confident
Users
Meta (confident)
Country
United States
Location
1 Meta Lp, Gallatin, TN 37066
H100 equivalents
99,545
Power
87 MW
Total capital cost
$3.3B
Current chips
B300
All chips
B300