Meta Aiken

Compute capacity
161.7K H100e
IT power
142 MW
Capital cost
$5.4B

Meta Aiken is an AI data center operated by Meta, located in the United States (7601 State Hwy 105, Trenton, SC 29847, USA). Its compute is used by Meta.

The site holds roughly 161,698 H100-equivalents of AI compute. It draws about 142 MW of power. Building and equipping it represents an estimated $5.4B of capital in 2025 dollars. It currently runs B300.

These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.

Timeline
080.8K161.7K2024-05-30: 02026-04-08: 02026-07-15: 161.7K2024-05-302026-07-15
Compute (H100e): 0 (2024-05-30) → 161.7K (2026-07-15)
Full record
Owner
Meta
Ownership confidence
Confident
Users
Meta (confident)
Country
United States
Location
7601 State Hwy 105, Trenton, SC 29847, USA
H100 equivalents
161,698
Power
142 MW
Total capital cost
$5.4B
Current chips
B300
All chips
B300