Google Waltham Cross is an AI data center operated by Google, located in the United Kingdom (Land at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH). Its compute is used by Google DeepMind.
The site holds roughly 123,800 H100-equivalents of AI compute. It draws about 88 MW of power. Building and equipping it represents an estimated $3.3B of capital in 2025 dollars. It currently runs TPU v6e, TPU v7.
Power is supplied through Shell Energy Europe, Engie. These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.