Google Red Oak is an AI data center operated by Google, located in the United States (330 Austin Blvd, Red Oak, TX 75154).
The site holds roughly 108,135 H100-equivalents of AI compute. It draws about 77 MW of power. Building and equipping it represents an estimated $2.9B of capital in 2025 dollars. It currently runs TPU v6e, TPU v7.
These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.