Live
AI data centers

Google Lancaster

Compute capacity
130.4K H100e
IT power
137 MW
Capital cost
$5.2B

Google Lancaster is an AI data center operated by Google, located in the United States (105 Whiley Rd, Lancaster, OH 43130).

The site holds roughly 130,369 H100-equivalents of AI compute. It draws about 137 MW of power. Building and equipping it represents an estimated $5.2B of capital in 2025 dollars. It currently runs TPU v5e, TPU v5p, TPU v7, TPU v6e.

These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.

Timeline
065.2K130.4K2021-10-01: 02024-01-01: 34.6K2025-09-11: 34.6K2025-10-31: 130.4K2026-03-12: 130.4K2021-10-012026-03-12
Compute (H100e): 0 (2021-10-01) → 130.4K (2026-03-12)
Full record
Owner
Google
Ownership confidence
Confident
Country
United States
Location
105 Whiley Rd, Lancaster, OH 43130
H100 equivalents
130,369
Power
137 MW
Total capital cost
$5.2B
Current chips
TPU v5e, TPU v5p, TPU v7, TPU v6e
All chips
TPU v5e, TPU v5p, TPU v7, TPU v6e
More from Google
SourceEpoch AI, 'AI Data Centers'. Published online at epoch.ai. Retrieved 2026-07-29 from https://epoch.ai/data/ai-data-centers. Licensed under CC BY 4.0.
← All ai data centers