Compute capacity
171.3K H100e
IT power
228 MW
Capital cost
$8.6B

Amazon Ridgeland is an AI data center operated by Amazon, located in the United States (1626 County Line Road Ridgeland, Mississippi). Its compute is used by Anthropic.

The site holds roughly 171,299 H100-equivalents of AI compute. It draws about 228 MW of power. Building and equipping it represents an estimated $8.6B of capital in 2025 dollars. It currently runs Trainium2.

Power is supplied through Entergy. These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.

Timeline
0394.1K788.3K2024-02-24: 02025-10-04: 02026-05-15: 171.3K2027-02-09: 214.2K2028-09-29: 788.3K2024-02-242028-09-29
Compute (H100e): 0 (2024-02-24) → 788.3K (2028-09-29)
Full record
Owner
Amazon
Ownership confidence
Confident
Users
Anthropic (speculative)
Project
Project Rainier #speculative
Country
United States
Location
1626 County Line Road Ridgeland, Mississippi
H100 equivalents
171,299
Power
228 MW
Total capital cost
$8.6B
Current chips
Trainium2
All chips
Trainium2, Trainium3
Energy suppliers
Entergy