78 tracked AI models list Microsoft as a developer. 2 of them are frontier models — among the largest training runs of their moment. The largest is MAI-Thinking-1, at 7 x 10^24 FLOP (June 2026). The most recent tracked release is from June 2026.
It owns 7 tracked AI data centers, holding about 1.7M H100e and drawing 1.52 GW. It operates 15 tracked GPU clusters.