75 AI डेटा सेंटर जिनकी स्थिति ज्ञात है, हर एक का आकार उसमें मौजूद कंप्यूट के अनुपात में — वे इमारतें जहां आर्टिफिशियल इंटेलिजेंस वास्तव में चलती है।
This map plots 75 AI data centers with a known position, holding about 12.5M H100e between them. Together they draw roughly 11.86 GW — the scale of a mid-sized country's electricity demand. Building and equipping them represents an estimated $449B of capital in 2025 dollars.
The concentration is extreme. The United States holds 93.6% of all located data-center compute across 66 sites, ahead of Malaysia (281.7K H100e across 1 site). The five largest countries hold 99.7% of it, out of 8 countries with a located site.
The single largest site is Colossus 2, operated by SpaceXAI, at 1.1M H100e and 946 MW. The operators with the most located compute are Google, Meta, Microsoft, SpaceXAI and Amazon. Epoch AI publishes street addresses rather than coordinates, so every dot here is geocoded from the address and records how far down it resolved — the ladder below says how many landed on a building and how many only on a town. Every figure is a modelled estimate reconstructed from permits, satellite imagery, chip orders and reported spending, not a disclosure.
| देश | साइटें | कंप्यूट | बिजली | पूंजीगत लागत |
|---|---|---|---|---|
| United States | 66 | 11.7M H100e | 10.80 GW | $409B |
| Malaysia | 1 | 281.7K H100e | 240 MW | $9.1B |
| China | 3 | 278.5K H100e | 632 MW | $24B |
| United Kingdom | 1 | 123.8K H100e | 88 MW | $3.3B |
| Indonesia | 1 | 84.4K H100e | 72 MW | $2.7B |
| Portugal | 1 | 31.8K H100e | 33 MW | $1.3B |
| Australia | 1 | 0 H100e | -- | -- |
| United Arab Emirates | 1 | 0 H100e | -- | -- |
| स्वामी | साइटें | कंप्यूट | बिजली |
|---|---|---|---|
| 20 | 3.2M H100e | 2.71 GW | |
| Meta | 13 | 2.4M H100e | 2.04 GW |
| Microsoft | 7 | 1.7M H100e | 1.52 GW |
| SpaceXAI | 2 | 1.4M H100e | 1.29 GW |
| Amazon | 3 | 1.1M H100e | 1.42 GW |
| CoreWeave | 7 | 705.2K H100e | 637 MW |
| Oracle | 6 | 593.7K H100e | 493 MW |
| Fluidstack | 1 | 130.4K H100e | 100 MW |
| Huawei | 1 | 123.8K H100e | 242 MW |
| VNET | 1 | 122.8K H100e | 221 MW |
| Alibaba | 1 | 31.9K H100e | 169 MW |
| Nscale | 1 | 31.8K H100e | 33 MW |
| Softbank | 2 | 0 H100e | -- |
| Firmus | 1 | 0 H100e | -- |
| G42 | 1 | 0 H100e | -- |
| नाम | स्वामी | देश | कंप्यूट | बिजली | पूंजीगत लागत |
|---|---|---|---|---|---|
| Colossus 2 | SpaceXAI | United States | 1.1M H100e | 946 MW | $36B |
| Microsoft Fairwater Atlanta | Microsoft | United States | 768.8K H100e | 636 MW | $24B |
| Meta Prometheus | Meta | United States | 763K H100e | 631 MW | $24B |
| Anthropic-Amazon New Carlisle | Amazon | United States | 685.9K H100e | 910 MW | $34B |
| OpenAI Stargate Abilene | Oracle | United States | 509.3K H100e | 421 MW | $16B |
| Microsoft Fairwater Wisconsin | Microsoft | United States | 445.7K H100e | 369 MW | $14B |
| Google Columbus | United States | 408.8K H100e | 303 MW | $11B | |
| Google New Albany | United States | 351.7K H100e | 339 MW | $13B | |
| Google Council Bluffs (East) | United States | 335K H100e | 237 MW | $9.0B | |
| Google Lincoln | United States | 287.5K H100e | 141 MW | $5.3B | |
| Google Bristow | United States | 283.7K H100e | 279 MW | $11B | |
| DayOne Nusajaya | -- | Malaysia | 281.7K H100e | 240 MW | $9.1B |
| Colossus 1 | SpaceXAI | United States | 275.8K H100e | 340 MW | $13B |
| Google Omaha | United States | 267.8K H100e | 237 MW | $9.0B | |
| CoreWeave Denton TX | CoreWeave | United States | 252.7K H100e | 262 MW | $9.9B |
| QTS Richmond 1 | -- | United States | 242.5K H100e | 238 MW | $9.0B |
| Meta Rosemount | Meta | United States | 215.8K H100e | 178 MW | $6.7B |
| Amazon Madison Mega Site | Amazon | United States | 214.3K H100e | 284 MW | $11B |
| Microsoft Goodyear | Microsoft | United States | 205.2K H100e | 202 MW | $7.7B |
| Meta Jeffersonville | Meta | United States | 203.1K H100e | 178 MW | $6.7B |
| Google The Dalles | United States | 201.6K H100e | 154 MW | $5.8B | |
| Google Midlothian | United States | 191K H100e | 103 MW | $3.9B | |
| QTS Richmond 2 | -- | United States | 182.9K H100e | 180 MW | $6.8B |
| QTS Richmond 3 | -- | United States | 174.8K H100e | 144 MW | $5.5B |
| Meta Montgomery | Meta | United States | 174.5K H100e | 153 MW | $5.8B |
| Meta Kuna | Meta | United States | 173.3K H100e | 152 MW | $5.8B |
| Meta Temple | Meta | United States | 173.2K H100e | 152 MW | $5.8B |
| Meta Cheyenne | Meta | United States | 172.8K H100e | 152 MW | $5.8B |
| Amazon Ridgeland | Amazon | United States | 171.3K H100e | 228 MW | $8.6B |
| Meta Aiken | Meta | United States | 161.7K H100e | 142 MW | $5.4B |
| Coreweave Helios | CoreWeave | United States | 159.6K H100e | 132 MW | $5.0B |
| Google Arcola | United States | 157.2K H100e | 77 MW | $2.9B | |
| Microsoft Project Osmium | Microsoft | United States | 155.6K H100e | 190 MW | $7.2B |
| Google Storey County | United States | 153.6K H100e | 161 MW | $6.1B | |
| Meta Eagle Mountain | Meta | United States | 151.4K H100e | 133 MW | $5.0B |
| Fluidstack Lake Mariner | Fluidstack | United States | 130.4K H100e | 100 MW | $3.8B |
| Google Lancaster | United States | 130.4K H100e | 137 MW | $5.2B | |
| Google Mesa | United States | 125.8K H100e | 90 MW | $3.4B | |
| Huawei Horinger | Huawei | China | 123.8K H100e | 242 MW | $9.2B |
| Google Waltham Cross | United Kingdom | 123.8K H100e | 88 MW | $3.3B | |
| VNET Bayin Ulanqab | VNET | China | 122.8K H100e | 221 MW | $8.4B |
| Google Red Oak | United States | 108.1K H100e | 77 MW | $2.9B | |
| Meta Gallatin | Meta | United States | 99.5K H100e | 87 MW | $3.3B |
| Meta Los Lunas | Meta | United States | 99.5K H100e | 87 MW | $3.3B |
| CoreWeave Ellendale ND | CoreWeave | United States | 93.5K H100e | 68 MW | $2.6B |
| CoreWeave Chester VA | CoreWeave | United States | 88.4K H100e | 82 MW | $3.1B |
| Oracle Batam | Oracle | Indonesia | 84.4K H100e | 72 MW | $2.7B |
| Google Papillion | United States | 80.3K H100e | 237 MW | $9.0B | |
| CoreWeave Marble NC | CoreWeave | United States | 78.8K H100e | 65 MW | $2.5B |
| Microsoft SAT40 | Microsoft | United States | 64.7K H100e | 75 MW | $2.8B |
| STACK Infrastructure NVA02 | -- | United States | 61.1K H100e | 85 MW | $3.2B |
| Stream Phoenix | -- | United States | 46.1K H100e | 64 MW | $2.4B |
| Microsoft SAT14 | Microsoft | United States | 45.2K H100e | 47 MW | $1.8B |
| Vantage TX1 | -- | United States | 38.7K H100e | 32 MW | $1.2B |
| CoreWeave Dalton 1 & 2 | CoreWeave | United States | 32.2K H100e | 28 MW | $1.1B |
| Alibaba Zhangbei | Alibaba | China | 31.9K H100e | 169 MW | $6.4B |
| Start Campus Sines Data Campus | Nscale | Portugal | 31.8K H100e | 33 MW | $1.3B |
| Google Pryor (North) | United States | 26.3K H100e | 53 MW | $2.0B | |
| OpenAI Stargate Lordstown | Softbank | United States | 0 H100e | -- | -- |
| Southgate Melbourne | Firmus | Australia | 0 H100e | -- | -- |
| QTS Cedar Rapids | -- | United States | 0 H100e | -- | -- |
| OpenAI Stargate Wisconsin | Oracle | United States | 0 H100e | -- | -- |
| OpenAI Stargate UAE | G42 | United Arab Emirates | 0 H100e | -- | -- |
| OpenAI Stargate Shackelford | Oracle | United States | 0 H100e | -- | -- |
| OpenAI Stargate New Mexico | Oracle | United States | 0 H100e | -- | -- |
| OpenAI Stargate Milam | Softbank | United States | 0 H100e | -- | -- |
| OpenAI Stargate Michigan | Oracle | United States | 0 H100e | -- | -- |
| Meta Sarpy | Meta | United States | 0 H100e | -- | -- |
| Meta Hyperion | Meta | United States | 0 H100e | -- | -- |
| Google Kansas City East | United States | 0 H100e | -- | -- | |
| Google Fort Wayne | United States | 0 H100e | -- | -- | |
| Google Cedar Rapids | United States | 0 H100e | -- | -- | |
| Goodnight | United States | 0 H100e | -- | -- | |
| Crusoe Abilene Expansion | Microsoft | United States | 0 H100e | -- | -- |
| CoreWeave Muskogee OK | CoreWeave | United States | 0 H100e | -- | -- |