Microsoft Fairwater Wisconsin is an AI data center operated by Microsoft, located in the United States (4800 90th St, Mount Pleasant, WI 53403). Its compute is used by OpenAI, Microsoft.
The site holds roughly 445,680 H100-equivalents of AI compute. It draws about 369 MW of power. Building and equipping it represents an estimated $14B of capital in 2025 dollars. It currently runs B200.
Power is supplied through WE Energies. These figures are modelled estimates, not disclosures: Epoch AI derives them from permits, satellite imagery and reported spending, with an uncertainty of roughly 1.4x to 1.6x depending on the metric.